median leg score: 106.5
calculated time lost: 47 (+1.0%)
split | cumulative total | |||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
# | dist | time | place | delta | score | lost* | pace | dist | time | place | delta | pace | comments | |||||||||||||||||||||
1. | 510m | 5:08 | 1 | -48 | -13% | 119.8 | 10:03 | 510m | 5:08 | 1 | -48 | -13% | 10:03 | Not the quickest with map copying as there was a lot of detail in the quarry. No mistakes. Direct line to control. | ||||||||||||||||||||
2. | 290m | 4:04 | 2 | +9 | 4% | 99.3 | 14:01 | 800m | 9:12 | 1 | -52 | -9% | 11:30 | Up the shallow reentrant and over the saddle. | ||||||||||||||||||||
3. | 610m | 3:22 | 1 | -23 | -10% | 111.2 | 15 | 5:31 | 1410m | 12:34 | 1 | -2:24 | -16% | 8:54 | Across the open to the path, cut corner to other path, but left it too early when attacking the control. Had to come down ridge again slightly. | |||||||||||||||||||
4. | 360m | 2:22 | 2 | +3 | 2% | 102.8 | 10 | 6:34 | 1770m | 14:56 | 1 | -2:21 | -14% | 8:26 | Aimed off to left of control and followed ride into control. Further left than expected though. | |||||||||||||||||||
5. | 740m | 5:00 | 1 | -8 | -3% | 113.9 | 6:45 | 2510m | 19:56 | 1 | -2:57 | -13% | 7:56 | Along the main ride. Slow as legs were tired from previous day. | ||||||||||||||||||||
6. | 300m | 2:32 | 1 | -2 | -1% | 107.0 | 15 | 8:26 | 2810m | 22:28 | 1 | -2:59 | -12% | 7:59 | U-turn and cut corner past root stocks and down path. Overshot on the path though and came back to the control from the path junction. | |||||||||||||||||||
7. | 780m | 4:51 | 1 | -19 | -6% | 106.8 | 10 | 6:13 | 3590m | 27:19 | 1 | -3:18 | -11% | 7:36 | Cut the corner through light green, which was actually slower. Than down ride and cut next corner directly into control. | |||||||||||||||||||
8. | 260m | 1:54 | 2 | +8 | 8% | 104.1 | 15 | 7:18 | 3850m | 29:13 | 1 | -3:40 | -11% | 7:35 | Onto path near 24, but came out too high. Down path / ditch from there. | |||||||||||||||||||
9. | 310m | 1:47 | 1 | -5 | -4% | 104.7 | 5:45 | 4160m | 31:00 | 1 | -3:50 | -11% | 7:27 | Straight. | ||||||||||||||||||||
10. | 160m | 1:08 | 2 | +1 | 1% | 101.5 | 7:05 | 4320m | 32:08 | 1 | -3:58 | -11% | 7:26 | Slightly right of straight. | ||||||||||||||||||||
11. | 350m | 4:57 | 3 | +22 | 8% | 95.4 | 25 | 30 | 14:08 | 4670m | 37:05 | 1 | -3:39 | -9% | 7:56 | Biggest mistake of day. Ended up too close to ruin coming over hill, than didn't read description. Though I was looking for tree, not ditch, so assummed for 10s that control was misplaced. | ||||||||||||||||||
12. | 320m | 2:40 | 1 | -23 | -13% | 121.3 | 8:20 | 4990m | 39:45 | 1 | -5:09 | -11% | 7:57 | Left to path to get around quarry cliff then straight. | ||||||||||||||||||||
13. | 130m | 1:21 | 1 | -5 | -6% | 108.2 | 10:23 | 5120m | 41:06 | 1 | -5:14 | -11% | 8:01 | Along cliff base and up cliff corner onto upper plateau. | ||||||||||||||||||||
14. | 220m | 1:49 | 1 | -18 | -14% | 177.7 | 8:15 | 5340m | 42:55 | 1 | -5:32 | -11% | 8:02 | Along path and down clearing into control. | ||||||||||||||||||||
15. | 240m | 2:55 | 1 | -4 | -2% | 106.5 | 12:09 | 5580m | 45:50 | 1 | -5:36 | -11% | 8:12 | U-turn back out to path and around quarry on left to get to next control. | ||||||||||||||||||||
16. | 220m | 1:32 | 1 | -2 | -2% | 111.2 | 6:58 | 5800m | 47:22 | 1 | -6:05 | -11% | 8:10 | Left around the cliff walls and jumped down to control from above. | ||||||||||||||||||||
17. | 270m | 1:53 | 1 | -4 | -3% | 103.8 | 6:58 | 6070m | 49:15 | 1 | -6:09 | -11% | 8:06 | Stayed high originally, then drifted down in re-entrant to lower path and straight into control. | ||||||||||||||||||||
18. | 210m | 2:41 | 1 | -40 | -20% | 118.8 | 10 | 12:46 | 6280m | 51:56 | 1 | -7:47 | -13% | 8:16 | Through green to clearing near 14, but ended up above embankment. Then straight to control through green. | |||||||||||||||||||
19. | 300m | 2:17 | 1 | -25 | -15% | 115.6 | 7:36 | 6580m | 54:13 | 1 | -8:34 | -14% | 8:14 | Straight as possible. | ||||||||||||||||||||
20. | 200m | 2:30 | 1 | -18 | -11% | 116.0 | 12:30 | 6780m | 56:43 | 1 | -9:28 | -14% | 8:21 | Right around quarry cliffs then jumped down a cliff to get to re-entrant behind the hill. | ||||||||||||||||||||
21. | 270m | 2:47 | 1 | 0% | 105.6 | 10:18 | 7050m | 59:30 | 1 | -9:56 | -14% | 8:26 | U-turn and straight past ruin. Dropped two terraces then contoured around quarry to control. | |||||||||||||||||||||
22. | 360m | 2:10 | 2 | +15 | 13% | 96.4 | 6:01 | 7410m | 1:01:40 | 1 | -9:57 | -14% | 8:19 | Straight (but slow). | ||||||||||||||||||||
23. | 670m | 4:58 | 1 | -27 | -8% | 106.5 | 7:24 | 8080m | 1:06:38 | 1 | -10:24 | -14% | 8:14 | Left of first green area then right along path and ride into control. | ||||||||||||||||||||
24. | 380m | 2:30 | 1 | -24 | -14% | 117.3 | 6:34 | 8460m | 1:09:08 | 1 | -11:18 | -14% | 8:10 | Straight line, cutting finer corner than did on 7 - 8. | ||||||||||||||||||||
25. | 500m | 3:36 | 1 | -1 | 0% | 101.1 | 7:12 | 8960m | 1:12:44 | 1 | -11:24 | -14% | 8:07 | Slowly dropped and contoured to corner, than across dam wall and down clearing to control. | ||||||||||||||||||||
26. | 310m | 2:49 | 1 | -3 | -2% | 101.6 | 10 | 9:05 | 9270m | 1:15:33 | 1 | -11:50 | -14% | 8:08 | Across field and through gate. Cut corner to depression. Slow. | |||||||||||||||||||
27. | 190m | 1:23 | 4 | +15 | 22% | 83.5 | 15 | 17 | 7:16 | 9460m | 1:16:56 | 1 | -11:35 | -13% | 8:07 | Very slow jog into the finish. Was blown over last 2.5 legs. |
* red = reported, gray = calculated